Neelum Jhelum Hydroelectric Project continued its operations, arriving at its pinnacle limit of 969 MW. The plant had been briefly closed down for the investigation of its tail race tunnel (TRT).
During the low-flow season, operations at the Neelum Jhelum Hydroelectric Project stopped on January 10 to work with the investigation of the restored tail race tunnel. Following a fruitful nitty gritty review, the operations continued, with investigation from the International Panel of Experts.
#Neelum #Jhelum #KirayePeyBlog #Hydroelectric